Tehran Potable Water Transmission Line
Back to Projects Archive
Completed — 2021

Tehran Potable Water Transmission Line

CP for steel potable water lines and soil corrosion monitoring.

Client
Water & Wastewater Co.
Site Location
Alborz — Tehran
Execution Year
2021
Departments Involved
Cathodic Protection Corrosion Monitoring
85 km transmission line
The Challenge

Galvanic corrosion at valve connections and aggressive regional soils.

Payeshco Engineering Solution

Impressed-current CP with monitoring stations every 5 km.

Client Endorsement

Official Testimonial

"Payeshco's solution significantly reduced line maintenance costs."
Eng. H. Nouri Project Manager — WWC