Back to archive
60,000 m³/day
Bandar Abbas Desalination Plant
CP and seawater-resistant coatings for the RO unit.
- 01 Client Water & Wastewater Co.
- 02 Location Bandar Abbas
- 03 Year 2023
- 04 Scopes Cathodic Protection Coatings & Surveys
Field gallery
2 frames
Challenge
Pitting corrosion on intake and discharge lines in seawater service.
Solution
Epoxy coating selection plus sacrificial CP in splash zone.
"Constructive collaboration during design review and material supply."
Nearby files