PayeshCo | Bandar Abbas Desalination Plant 
Back to archive
File · 2023 In Progress

Bandar Abbas Desalination Plant

CP and seawater-resistant coatings for the RO unit.

Bandar Abbas Desalination Plant
60,000 m³/day
  1. 01 Client Water & Wastewater Co.
  2. 02 Location Bandar Abbas
  3. 03 Year 2023
  4. 04 Scopes Cathodic Protection Coatings & Surveys
Field gallery 2 frames

Challenge

Pitting corrosion on intake and discharge lines in seawater service.

Solution

Epoxy coating selection plus sacrificial CP in splash zone.

"Constructive collaboration during design review and material supply."

Eng. F. Jafari Project Technical Supervisor