Mobin Petrochemical Complex

CP for tanks, columns, and process piping with coating inspection.

Mobin Petrochemical Complex
12 process units
  1. 01 Client Mobin Petrochemical Co.
  2. 02 Location Assaluyeh
  3. 03 Year 2022
  4. 04 Scopes Cathodic Protection Coatings & Surveys
Field gallery 4 frames

Challenge

Under-coating corrosion on C5/C6 tanks and welds with defective coating. Supplementary CP required without conflict with existing grounding systems.

Solution

Local CP design for tanks, permanent reference electrodes, and DFT/holiday detection program. Coordination with earthing department for galvanic isolation.

"PayeshCo coordinated seamlessly with the EPC contractor and commissioned CP without production shutdown."

Eng. S. Karimi Maintenance Head — Mobin Petrochemical