Back to archive
24 storage tanks
Assaluyeh Storage Tanks
CP system rehabilitation for intermediate product storage tanks.
- 01 Client National Petrochemical Co.
- 02 Location South Pars Special Zone
- 03 Year 2019
- 04 Scopes Cathodic Protection Coatings & Surveys
Field gallery
2 frames
Challenge
Severe CP current drop and failure of legacy rectifiers in a coastal environment.
Solution
TR replacement, anode bed redesign, and polarization decay testing.
"Execution quality and technical documentation met international standards."
Nearby files