PayeshCo | Abadan Refinery 
Back to archive
File · 2018 Completed — 2018

Abadan Refinery

Rehabilitation of storage tank cathodic protection systems.

Abadan Refinery
36 tanks
  1. 01 Client NIORDC
  2. 02 Location Abadan
  3. 03 Year 2018
  4. 04 Scopes Cathodic Protection
Field gallery 3 frames

Challenge

Legacy CP unable to cover large tank floors adequately.

Solution

Under-floor grid anodes and remote-monitored TR units.

"Among the most successful tank CP projects in southern Iran."

Eng. N. Bagheri CP Lead — Abadan Refinery