High soil resistivity requiring IEEE 80 compliant mesh grounding.
Back to Projects Archive
Completed — 2021
Ramin Thermal Power Plant
Earthing and lightning protection for boiler and turbine units.
4×350 MW
Field Gallery
Field Imagery
Execution phases, DCVG/CIPS field tests, and installed equipment.
Grid design, deep rods, chemical backfill; fall-of-potential testing.
Client Endorsement
Official Testimonial
"Earth resistance achieved below 1 Ω."