PayeshCo | Ramin Thermal Power Plant 
Back to archive
File · 2021 Completed — 2021

Ramin Thermal Power Plant

Earthing and lightning protection for boiler and turbine units.

Ramin Thermal Power Plant
4×350 MW
  1. 01 Client Tavanir Power Co.
  2. 02 Location Ahvaz
  3. 03 Year 2021
  4. 04 Scopes Earthing & Lightning Coatings & Surveys
Field gallery 2 frames

Challenge

High soil resistivity requiring IEEE 80 compliant mesh grounding.

Solution

Grid design, deep rods, chemical backfill; fall-of-potential testing.

"Earth resistance achieved below 1 Ω."

Eng. D. Sharifi Technical Manager — Tavanir